11.01.2023
For the Avtokran-Tyumen team, the New Year holidays are not a reason to stop working on projects. Already in the first days of the new year, a set of measures for servicing the Kochubeevskaya wind farm, Russia's largest wind farm located in the Stavropol Territory, was successfully completed. During this project, which started in November 2022, generators were replaced at 5 wind turbines.
At the same time with the successes in the field of wind energy, our specialists show outstanding results in a series of winter projects at oil and gas facilities in northern Russia. Currently, one of such projects is a set of measures for the arrangement of the surface part of wells and downhole equipment at the facilities of JSC Arktikgaz in the Yamalo-Nenets Autonomous District. A professional team and reliable equipment capable of withstanding harsh climatic conditions give us the opportunity to perform work significantly ahead of schedule.