The construction of the Medvezhenskaya wind farm was completed in the 4th quarter of 2021. As early as December 1, 2021, this wind farm began to supply electricity and capacity to the country's unified grid.
The Medvezhenskaya wind farm is located on the territory of the Trunovsky municipal district of the Stavropol Territory.
The wind farm includes 24 wind turbines with a capacity of 2.5 MW each. The installed capacity of the wind farm is 60 MW. The planned average annual energy production is 171 million kWh.